Laserfiche WebLink
� 3 <br /> CLOSED CIi AOR1C ORDERS REPORT NOT A C{:�I 7o(p <br /> Total Utility Maintenance Management System <br /> 10/13/1997 Page 1 <br /> -------------------------------------------------------------------------------- <br /> Date Range :01/04/1989 - 10/09/1997 <br /> CM Work Order Ranqe :1001091070001 - UT0021-35- Pattern :7101196751231 <br /> Item Range :<Blank> - WVL3694L05 Pattern :* <br /> Proqram ALL Function ALL Activity ALL <br /> --------------------------------------------------------------------------------- <br /> -------------------------------------------------------------------------------- <br /> CM WORK ORDER ID: 7101196751231 Title: RENEW 2215 ROCKEFELLER AVE <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Ztem ID: WS2095M001 -- WATER SERVICE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> Date Completed: 09/12/1997 <br /> Overall Craft: <br /> Issued: 09/09/1997 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.0o Hr. <br /> Meter Readinq: ' <br /> Downtime: 0 hours <br /> Status: <br /> LabOr: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> WST TDE1 THOMPSON, DWAYNE E. 0. 00 1.50 28.73 <br /> UL WTE WESTVANG, 'PERRY E. 0.00 1.50 23.67 <br /> Total Labor Cost: 52.40 <br /> Mat�riala: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA @ 09/10/1997 1 15.34 <br /> SADD44016847 SERVICE SADDLE 6" W/3/4" CCT 09/10/1997 1 11.38 <br /> Total Material Cost: 26.72 <br /> vehicles: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> VJ0026 '97 FORD 1 TON SVC TRUCK 1. 50 8.85 <br /> Total Vehicle Cost: S.SS <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> $100.00 DEPOSIT TO INCREASE S�RVICE SIZE AT TIME OF CONNECTION <br /> Total cost for work order 7101196751231: 87•97 , <br />