Laserfiche WebLink
CLOSSD CM WORR ORDfiRS REPORT <br />Total Utility Maintenance Management System <br />02/O1/1996 Page 1 <br />---------------------------------------------------------------------------- <br />Date Range :O1/09/1989 - O1/31/1996 <br />CM Work Order Range :1001091070001 - UT2608- - Pattern 7101196750602 <br />Item Range :<Blar_k> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />________________�__________'______________________________________________------- <br />CM WORK ORDER ID: 7101196750602 Title: CONVERT 2328 ROCKEFELLER ��� <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: W51995J122 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Func�ion 119 Activity 675 <br />Date Completed: O1/24/1996 <br />Overall Craft: <br />issued: O1/22/1996 <br />Out of Service? NO <br />Meter Reading� <br />Downtime: 0 hours <br />Status: - <br />Labor: <br />Craft ID <br />EO CCL <br />HEO JRM <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000547 <br />ADAP34000747 <br />COUP34004347 <br />COUP34142747 <br />ELL034101447 <br />METE34141847 <br />NIPP32131547 <br />REDU32100747 <br />SETT34033647 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned Hrs :Actual Hrs Cost <br />-----------------•------------ ----------- ---------- ---------- <br />CRAIG, CHESTER L. 0.00 3.00 55.59 <br />JOHNSON, RICHARD M. 0.00 2.00 39.40 <br />Description <br />ADAPTER 3/4" CST X INSTA-TITE� <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" RI X RI @ <br />COUPLING 3/4" MIP X COP ELL Q <br />COUPLING 3/4" CTS COMP X MIPTQ <br />ELL 3/4" 90 DEG BRASS " <br />METER 5/8" X 3/4" NEPTUNE <br />NIPPLE 1/2" X 3" BRASS � <br />REDUCER BELL 1/2" X 3/4"SRASS" <br />SSTTER COP 5/8" X 3/4" (H12") <br />Total Labor Cosc: <br />Date <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br />O1/24/1996 <br /># Used <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Vehiclee: Cost <br />ID Description Hours <br />------------ ----------------------- <br />------- ------ ------ <br />V2139 86 CHEV 1-TON W/HYD. UNIT 3.00 _____15_30 <br />Total Vehicle Cost: 15.30 <br />Work Description: <br />-------------------------------------------------------- <br />METER# 40913374 <br />-----94.99 <br />Cost <br />------7.60 <br />15.42 <br />3.24 <br />3.83 <br />4.48 <br />1.35 <br />85.73 <br />1.20 <br />1.34 <br />51.92 <br />176.11 <br />