Laserfiche WebLink
REPAZR Si .,:Z?ZC?TIGNS ?:dD LIST 0? W(,.{ TO 3c BID <br />Page 3 of �j <br />Address: Z4z5 Rockefeller <br />2. P�cch Deck See drawing f�r o��ch repairs. Hrace <br />gable �verhangs abnve p�rch deck. Tear �ff existing <br />skicting. Tear nff cntted and warped deck b�ards, <br />especially under pnsts. Tear nff existing trellise <br />beams and girder. Tear off existing railing and <br />handrails. Tear �ut rntted posts under deck. <br />P�ur new 18" x 18" x 8" cc+ncrete fnoting pads, maximum <br />6" bel�w gcade, at l�cati�ns indicated in drawings. <br />Install 16" x 16" precast piec bl�cks �n pads and as <br />indicated. Install c�ntinu�us 6" x 6" DF U2 p�sts fc�m <br />f��tinys tn deck under gable suppnrt p�sts and thr�ugh <br />deck as shnwn at nther lncatinns. pr�vide minimum 6" <br />clearance between wnod pnsts and any s�il. Install 15M <br />felt between posts and pier bl�cks. Chamfer t�p edges <br />�f pnsts that cnntinue thr�ugh deck. Level deck east tn <br />west, leave sufficient sl�pe n�rth tn snuth t� drain. <br />Bnit all Qc�StiS t� rim j�ist belnw deck. P�sts at east <br />end of deck in n�rth and snuth cnrners shall be <br />replaced. C�nfirm details invnlviny pnst/deak <br />connecti�ns with H�using Impr�vement Inspect�r. <br />Install new 2" x 6" jnists under deck between all bays <br />with greater than 16" O.C. spacing. Attach at ends with <br />metal j�ist hangers. Replace missing decking t� match <br />existing. New decking : T s G. Install 2 x 4 backing <br />fnr skicting, minimum 6" ab�ve grade, attached t� <br />pnsts. On east end �f deck, frame in E�c access dn�rs <br />tn area beneath deck: Access dn�r : w�•king latch and <br />hinges, minimum 4' high and 2' 6" wide. Framing f�r <br />skirting cnntinue undec east steps. Install cedar <br />lattice skirting nver backing nn east and snuth area of <br />porch beneath deck. Trim at tnp with 1 x 12 cedar <br />b�ards and at vectical edges with 1 x 4 cedar. H�ld all <br />cedar minimum 2" above grade. <br />Ins<all new railings around deck perimeter and d�wn each <br />se:: nf steps as shown. Tnp and bottnm rails : 2 x 4's <br />D.F. #2 n[ better. Secure rails tn pnsts with w��d <br />screws, countersink belnw surface. Putty h<�les f�r <br />paint. Install 2 x 2 balusters, 6" cloaz npening <br />between members as sh�wn. Ease t�p edges nf tnp ra:ling <br />thrnughnut. Railing : 36" ab�ve deck. Install new w��d <br />handrails nn bnth steps as sh�wn t� cnde, handrails . <br />return tnp and b�tt�m. Caulk between deck and h�use tn <br />pcevent drafts. <br />Install additi�nal stringer u�der east steps frnm deck <br />tn grade, 2 x 12, DF #2 �r better, between existing <br />stringecs. Place 15# felt between stringers and pad. <br />� .� 5l%,. 3 c� <br />3. Exteri:�r Painting Pnwer wash and scrape existing <br />siding. Replace missing b�ards and cnver and seal �pen <br />panels by kitchen d��r. Prime all new and bare w��d <br />with nil base primer. Paint entire h�use and pnrch, <br />exteri�r latex, tw� c�ats, twn cnl�rs, �wner chnice �f <br />cnln�. Paint : pr�vide minimum ten year manufacturer's <br />guarantee. Leave stnrm wind�ws nn h�use, d� nnt paint. <br />Paint deck and sr_eps with twn cnats deck painr with <br />abrasive admixture, �wner ch�ice nf cnlnr. <br />$ .�_4Ci �� <br />