Laserfiche WebLink
_ �, s,�.�io�-a�=�-! — � ,z� <br />� �,�,�.. �v S� i.y.� �.�:' f c vP� <br />� C c.—� j C¢.0��2. vGL 3— <br />MEMORANDUM OF AGREEMENT REGARDINC SEWER WORK IN <br />THE VICIIVITY OF LINCOLN FIELD <br />This Agreement is by and between the City of Everett ("City"), and the Evarett School District <br />No. 2 ("DisuicC') <br />WHEREAS, the District owns a grass play field in north Everett on the city block between <br />Rockefeller Ave and Oakes Ave from 25th St to 26th St.("Lincoln Field"); and <br />WHEREAS, the District intends to tenovate Lincoln Field in the summer and fall of 2003 with <br />backstops, bleachers, drainag� system, and an aetificial turf playing surface (the "Renovation Project"', <br />and <br />WHEREAS, the City owns a sewer line that runs north and south through the r.uddle of Lincoln <br />Field ("Existing Sewer Main"); and <br />WHEREAS, the Fxisting Sewer Main is located in a vacated street rightof-way, for which the <br />Ciry has no recorded easement rights, :u�d if the Existing Sewer Main remained in its cumnt lceation, <br />future repairs would require ezcavation in the turf.area, with resulting disn�ption of schedules, <br />inconvenience and loss of use; and <br />WHEREAS, while the DisVict takes Lincoln Field out of service for renovation, the City can <br />abandon the Existing Sewer Main by intercepting the sewerage flow at 25th St and conswcting a new <br />sewer line ("New Sewer Maid') East along 25th St. and connecting to an existing fifteen inch diameter <br />sewer main in the alley East of Oakes Ave. (the "Sewer Project"), with minimal or no disruption or loss <br />of use to the users of Lincoln Field; and <br />WHEREAS, the City and the District can save costs by sharing some expenses and cau provide <br />better functionality to their respective facilities, thus benefiting the public, by discontinuing the u�e of the <br />vacated street right of way in the middle of Lincoln Field as a sewer main facility lxation; <br />NOW, THEREFORE, the Ciry and the Di.:rict agree az follows: <br />1. DURATION <br />The tertn of this Agreement shall be from the date signed by both pacties to the later of December 31, <br />2004 or the date the Sewer Project is complete, unless earlier terminated ptrsuant to this Agreement. <br />2. CITY RESPONSIBILITIES <br />7'he Ciry will desi�i and conswct the Sewer Project by October 15, 2003. The City shall be responsiblc <br />for obtrining all pertnits and shall pay (or all costs associate� with the Sewer Project <br />3. DISTRICT RESPONSIBILITIES <br />p. The District shall reimburse the City for one half of the actual, (inal costs of the Sewer Project, <br />up to a maximum of 7'hirty Five Thousand and 00/100 Dollars ($35,000.00), within thirty days' of <br />completion of the Sewer Projcet and receipt by the District of an iuvoice and summary of costs incurred <br />�/2 <br />