My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2720 ROCKEFELLER AVE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
2720
>
2720 ROCKEFELLER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 1:14:18 PM
Creation date
2/27/2017 1:12:50 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2720
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r-- <br />F <br />March 27, 1980 <br />Everett City Public Works Dept. <br />3200 Cedar Avenue <br />Everett, Washington 98201 <br />Re: Teiaporary hold on work at <br />Y.PI .('-A„ Fver-tt; WA <br />Dear Mr. Ron Cameron: <br />CONTRACTORS LICENSE NO. <br />CO-CR-AC- C24CE:: <br />P.O. Box 1299 <br />Everetl,Wash.98206 <br />258-3667 <br />17 IT <br />................................ .............. <br />.._-.r <br />CITY 07 EVERETT J <br />Public Works wept, <br />As of this date, the Board of Directors for the Y.M.C.A. has <br />issued a temporary hold on work at the new Y.M.C.A. located <br />at Rockefeller and California in Everett, Washington. This <br />hold is effective for an undetermined period of time. <br />It is Cobra's understanding that this decision was made by <br />the Board of Directors because pledge monies were slow in <br />coming. In addition with the current interest situation, <br />a long term mortgage was undesirable. <br />It is further understood by Cobra that the new 'Y' will be <br />built; but the time frame for resumption of work is entirely <br />predicated on sufficient monies to build with short term <br />mortgages. <br />Therefore, Cobra Construction is requesting that you tempo- <br />rarily discontinue all work related to this project. If <br />applicable, please expedite any billing for completed work <br />so that Cobra may close out in an orderly fashion. <br />At this time, may I take this opportunity to thank all of <br />you personally for your superb expertise aid and cooperation <br />on this project to date. <br />Very truly yours, <br />COBRA CONSTRUCTION CO. <br />Ralph Peterson <br />Project Superintendent <br />jar <br />
The URL can be used to link to this page
Your browser does not support the video tag.