My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2720 ROCKEFELLER AVE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
2720
>
2720 ROCKEFELLER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 1:14:18 PM
Creation date
2/27/2017 1:12:50 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2720
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70 Bob Landles - Plannine, Department � ' 410 <br />r,,am Public Works Department ( - <br />„A,; March 10, 1980 <br />;u;m.or S. E.P. A. Checklist Review 11188 <br />CITY OF EVEREIT. EVERETT. WASH IN GI ON <br />Planning File #80-12 <br />Proposal: <br />To demolish major portion of existing YMCA building and construct 551000 <br />square foot replacement building at northwest corner of California and <br />Rockefeller. <br />Recommendations: <br />it is the recommendation of the Public Works Department that issuance <br />of a Negative Declaration be subject to the following: <br />1. A detailed drawing shall be submitted to the Public Works Department <br />showing parking layout, landscaping, driveways, utilities. storm drainage, <br />and all required improvements to the public right-of-way. Public Works <br />Department approval of these drawings is required before Right Of Way <br />Use Permit is issued. All improvement, shall be completed before the <br />Occupancy Permit is issued. <br />2. Temporary Right Of Way Use Permit is needed during construction phase <br />for temporary pedestrian, facility, use of street and/or sidewalk during <br />construction. <br />3. City streets are to be kept clear of dirt and debris during construction. <br />4. During construction, all truck traffic to and from the site within the <br />rterial streets unless otherwise approved <br />City of Everett shall be on a <br />by the Public Works Department. <br />5., Since expansion is over existing parking lot, on -site detention is not required, <br />however a grease trap is required. <br />6. A Pre -construction Conference is required involving, applicant, contractor, <br />all sub -contractors, Fire Marshall, Planning Dept. Coordinator, Building <br />Department Coordinator, Public Works Coordinator, Public Works Inspectors, <br />Traffic Engineer and Permit Coordinator. <br />Amend Checklist As Follows: <br />11 - 13 - a, b, c, d and f - change to yes. <br />d F1011 <br />�E <br />U <br />VM <br />
The URL can be used to link to this page
Your browser does not support the video tag.