Laserfiche WebLink
&�fMOAS� <br />21 December 1992 <br />M� <br />ay <br />Jozx <br />C H <br />9yrO <br />Ken Jackson <br />o x o Everett Building Dept. <br />h3 H hd 3200 Cedar Street <br />y �'r Everett, WA 98201 <br />x <br />y 0 RE: FIRST PRESBYTERIAN CHURCH BUILDING REPAIR <br />o <br />Dear Ken: <br />9H <br />C x We have made periodic visits to check the construction in progress at the above <br />gH y referenced site as requested by Mr. Maurice Klein of the First Presbyterian Church. <br />H <br />C1 C7 ca <br />On November 9, 1992, I made a final visit to the site. <br />y yo y nd Construction was at the site. He <br />Gregg of Newlastated that they have completed the <br />repair work per construction documents provided by this ofofleed plansobserved <br />prov dedthat <br />byall <br />th thisrepair <br />work was completed and was in compliance with the aPP <br />office. <br />If you have any questions, please give me a call. <br />Sincerely, <br />JOHNSONICOASTLINE AS CIATES, INC. <br />Nick Lehtinen, P.E. <br />Senior Project Manager <br />cc: Maurice Klein <br />Newland Construction <br />EngineeringlPlanning-2911 Bond Sheet, Suite 201, Everett, Washington 98201, (206) 259.60711Se01e 362-6884 <br />