Laserfiche WebLink
.�, <br />`^�� .� a. <br />144 <br />I� <br />�(S GV;r��,v a r�P f�ri-Q-' <br />(2oe� naaeze <br />���-'� .::.THE RICE GROUP, INC. � �14RailroadAve. <br />SW,e 2,2 <br />Edmonde, Weshinpton <br />V�`'-'��O�C �: CONSULTINO ENOINEERS 98020 <br />s <br />IRnue Suite 212 Edmonds, Wasnington <br />98020 <br />%� TELBPHONE REPORT v/ <br />Project SNO-PAC Proiect No. 89-012 1 <br />Date May 7, 1990 Time: 7:50 a.m. Phone 259-8810 <br />Participants: Ted Budden - Citv of Everett <br />Chris Wright - The Rice Group <br />Report By: C. Wriaht Date of Report: 5-14-90 <br />Called regarding Mr. Budden's indication that fire daa.pers would be <br />required on the air handler in the corridor. Ted informed me that <br />the fire dampers would only be required if there were return or <br />supply openings in the corridor itself. No openings are indicated <br />on the plan. Thus, no fire dampers are required. <br />Note: This conference record was mailed by of The F.ICE Group <br />on . Its contents should be carefully reviewed by the <br />recipient who should immediately report inaccuracies or mis-statements, if. <br />any, to the pers�n at The RICE Group whom prepared this conference record. <br />