My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
PARKING GARAGE
>
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 9:44:16 AM
Creation date
2/27/2017 1:41:36 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^�:'I.'.I.�i.�.�:.`,'. C.��'yj� .�`. ��I'��. ��\C. <br />rccommcnd an allo�eablc passivc pressurc of I JO pci .ind 130 pcf, respcctivcly. Both thc <br />cocfficicnt and passivc pressurc ��:�lucs abovc includc a factor-of-safety (PS) of 1.5. <br />10.7 Floor Slabs <br />ln our opinion, floor slabs for thc Administration Garagc and pedcstrian tunncl could consist of <br />slabs-on-gradc. r111 fill placcd undcr slabs-on-�radc, including backfill for iooting excavations, <br />utilitics, etc., should consist of properly compacted stnicwral fill ovcr dcnsc/hard, nativc soil. <br />We estimate that a modulus of suUgradc reaction equal to 250 pounds per cubic inch (pci) for <br />dcnscly compactcd strucwral fill over properly prcpamd nati��c soil and 300 pci (or ��cry <br />densc/hard nativc soil could bc uscd for dcsign of slabs-on-gradc. This rccommcndation <br />assumes th�t proper drainage is provided bencath thc iloor slabs. We recommcnd that a system <br />of subdrains bc installcd bcncath thc garagc (loor slaUs. Rccommcndations for subdrains arc <br />prescnted latcr in this rcport. <br />10.8 '1'emporary �xc:n'ation Shorin�; <br />10.8.1 Oacrvic��• <br />In gencral, Uic sitc is undcrlain Uy vcry dcnsc/I��ard glacially ovcmddcn soils a, rclativcly <br />shallo��� dcpths. \1�e are currently dcsigning soil nail shoring walls Cor temporary suppon of thc <br />Administration Garage excavation. As shown on the attached generalized subsurface profiles, <br />thc ���;�tcr-bcaring advancc ouhvash unit is abo�'c Ihc basc of thc proposed cacavation. <br />Additional zoncs of ���atcrvbcaring matcrial may bc cncountcrcd throughout thc cxcavation. <br />"I'cmpor:�ry dewatcring mcasures will bc required in order to inslull soil nail shoring. Becausc <br />soil nailin� has been chosen as the preferrcd shoring system, ���e recommend that the contractor <br />bc preparcd lo dcal aggressivcly ���ith thc anticipatcd ground���ater conditions before the <br />cxcavation dccpcns to the ground���:uer Ic��cl. We undcrstand that a 20- to 25-foot-deep sanitary <br />sc�vcr pipclinc ���ill bc trenchcd down thc ccntcr of Oakcs Avcnuc possibly prior to soil nail <br />installation. Thc backfill and construction timing of thc scwcr pipclinc installation may also <br />affcct the soil nail design. In gencral, if there are deep utilities under the surrounding strcets, it is <br />likcly that thcre is morc fill prescnt bcncath thc succts than what ���as cncountcrcd in our borings <br />within thc site. Typically, soil nails have a closer spacing and arc longcr when used in fill soils. <br />Temporar�� soil nail shotcrete facing may need to be thicker and have more reinforcing to <br />,i i���:��,,,�.i:: ,:��.�: <br />Id <br />'_ I -I -0�)G 1�1-00� <br />
The URL can be used to link to this page
Your browser does not support the video tag.