My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
PARKING GARAGE
>
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 9:44:16 AM
Creation date
2/27/2017 1:41:36 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tony Lee <br />From: <br />Sent: <br />To: <br />Subject: <br />Phii Gioia [pmgioia@cbg-engrs.comJ <br />Monday, January 12, 2004 2:38 PM <br />Steve Miller <br />FW: Snohomish Garage and transport tunnel - Drainage <br />l'jl,� �( -G,� % <br />----Original Idessage----- <br />From: Phil Gioia <br />Sent: Monday, January 12, 200� :'.:35 F61 <br />To: 'smiller@ci.everette.wa.u�' <br />Cc: 'Tony Lee (tlee@ci.everett.wa.us)'; " Ding Yc' i�,���r�'ir'midri.co:n)'; <br />'Hu9h Kuyper'; Phil Roach; 'Kerry Hedegus (khegecius@nbbj.com)'; " �arry <br />Goetz' AIA (lgoetz@nbbj.com)'; 'blehtonen@nbbj.com'; i��dam Crar!son <br />Subject: Snohomi.sh Garagc and transport tunnel - Drainaye <br />Hi Stev��- <br />".'his ema:! contir:ms ouc pnc:�,-� �._�ne•�rsati��n. I cal'_ed to inyuize ,i6nut. <br />requiruments for the 3 d���in;; iu Uic ne��: tr�nsport Lunn��l ..onnecting !:he <br />new jail Co Che existing courtt�ouse. '1'he tunnel is adjacent to the m-�,i <br />garage. These tunnel drains are b�sically emergency drains that wi11 <br />pick up �vater very infrequently - only if sprinkler discharges in the <br />tunnel or if the tunnel is hosed down. We have a drainage pipe in cl.osc <br />prosimity to the tunnel that is picking up the tunnel underfloor <br />draina9e system (designed as part of the civil documents). This pipe <br />connects to area drains in bottom level of the garage and routes through <br />a grey water sump pump in lowest level of the garage (also designed b, <br />civil). {9e are proposing to connect the floor drains in the tunnel to <br />this pipe and route these drains thro�gh the sump pump. The floor <br />drains in the tunnel will be trapped, primed and vented. 8ased on ou: <br />.iiscussion, we understand that connecting these drains to the greywater <br />:��.unp pump is acceptable to the city of Everett. We will proceed <br />:�-cordingly. <br />.: you have any questions, please do not hesitate to contact our office. <br />'�. also reeeived a call form Paul Mekce �:�;th thc ci[v. I=.��ut ia,iicated he <br />�a;�s ok with this �pproach. I have copi��d turi on thLc cr,.�i.1. <br />Fhi1 Gioia, P.E. <br />Project F.ngineer <br />C8G ConsultiRg !�:uyinucrs, ir.i . <br />bG50 S.W. Eiedwou:t i..�n�z <br />�brtland, Oregon N�'::�.'.�1 <br />Fhone: (503) 620-3:'�:' <br />I'ax: (503) 6?_0-03;a <br />�..ww. � bq-��nars. -.�n::i <br />
The URL can be used to link to this page
Your browser does not support the video tag.