My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
PARKING GARAGE
>
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 9:44:16 AM
Creation date
2/27/2017 1:41:36 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 26, 2004 <br />Mr. Larry Goetz <br />NBDJ Design <br />1 1 1 South lackson Street <br />Seattle, Washinyton 98104 <br />S�bjed: Snohomish County Parking Garagu <br />Evaratt, Washington <br />Re: StruduralObservation <br />Dear Mr. Go�tz: <br />MAGNUSSON <br />KLEMLNCIC <br />:.ss�_c arts <br />�jC�� l I -G�7 <br />Magnusson f:lemencic ftissociates (MF:i1), s'ructurol enyineers for the new Snohomish County Parking <br />Gorage, have observed ihe progress o( conslruchon of the primary structure. We have answered the <br />controdor's requests for informa�ion, revfewed the shop drowings, and performed periodic site <br />observations at intervols appropriote lo ihe stages of construdion of the structure. On•site inspettions <br />and required special inspedions were per{ormed by an independent tesiing agency employed by Ihe <br />owner. <br />To Ihe best of our knowledge and �nformalion, the construttion generally conformed to the approved <br />plans and specifications. Deficicncies noted by the owners tesfing agency were reviewed by MKA, and, <br />when necessary, corredions io the construction were made. <br />Based on the observotions, cambined with our review o( the current testing agency repons (we aie <br />awai�ing the finnl reports), we hove conduded that, to Ihe besl of our knowledge, informarion, r,nd <br />belie(, all deficienaes observed have been resolved. This observation does not include observonon of <br />the Prisoner Transport Tunnel or the Rockefeller Romp Entrance, which have yet to be cemple�ed. <br />Plense call if yc�� have any quesfons or reqvire furthcr information. <br />$incerely, <br />Mognusson Klemencic Associates, Inc. <br />` �� ��_ <br />Pat Harrigon <br />pharnqan��mko.com <br />PH/doh <br />�\i.�oCqPcd cp\u�.:�sp\GoeC Ca�L4m:C6fen 0?:OOA hrdoc <br />StruUural � Civil Fngiuee�t <br />_.' IF�c.� _ �nJiQi c.,�q• �.�r:r..:'� �... . :C�.'i <br />i _,.,... ,:J: ..... . ... ...... ...c <br />
The URL can be used to link to this page
Your browser does not support the video tag.