My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3102 ROCKEFELLER AVE 2016-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
3102
>
3102 ROCKEFELLER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 6:18:37 PM
Creation date
2/27/2017 1:43:55 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3102
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, the Board of Adjustment of the City of Everett <br />does hereby order that the variance be GRANmED to allow instead of� <br />and further require the applicant to meet the following <br />conditions. , <br />1. Design the proposed parking area in an arrangement similar <br />to the plan recommended by the Public Works Department in <br />order to provide five off-street parkinq spaces and effec- <br />tive traffic flow pattern without the need for any vehicles <br />to back across the public sidewalk when leaving the site. <br />2. Detailed drawings in accordance with City Design and <br />Cosntruction Standards shall be submitted to the Publilc <br />Works Department showing site parkinq layout, landscaping <br />and stocm drainage system <br />3. A five foot wide planting area shall be provided where the � <br />parkinq lot abuts the public right of way excapt for drive- I <br />ways. This planting area shall consist of continuous live � <br />ground cover over at least 75� of the planting area and ever- , <br />green trees, shrubs or other vertical growth a minimum of <br />three feet in haight at time of plantinq to number six for <br />ench 10o square feet of required landscaped area. Plantings <br />shall be sufficient to provide full coverage within three <br />years of plantinq. <br />The action of the Board of Adjustment in GRANTING a varinnceli <br />shall be final and conclusive, unless within fifteen (15) days� <br />from the date of issuance and signfng of this order by thel <br />Chairman of the Board, an agqrieved person or persons obtnins a <br />writ of certiorari from the Superior Court of Waehington fori <br />Snohomish County for the purpose of review of the action taken. � <br />DATED thi <br />r. <br />Notes to Applicant: <br />1989.1 <br />1. If a building permit is not obtained within one year from the', <br />� above date, the Board�s decision shall cease to be effective.i <br />Prior to the expi.ration date, a written request for a;� <br />six-month extension may be submitted to the Planningl <br />Director. �, <br />2 A copy of this order must be submitted by the Applicant wheni <br />applying for building permits. I <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.