Laserfiche WebLink
TO POSTING s� 2 � �Q4� <br />� <br />' CL088D Cri IIORE ORDERB REIIORT <br />Total Utii.ity Maintenanca Manaqemant System Page Z <br />07/16/1997 <br />--�-==szsz::z��s�:a::"�--c=vsa�ssaa-x===-ve�e <br />xs�smece-a:�-ace-ev:ase=�x=va�maasz� <br />Date Range :12/03/1900 - 07/O1/1997 <br />CM Work Order Range :1001091�70001 - PW2548-19- pattern :*101196649342 <br />Item Ranqe :<Blank> - WVL3694L05 <br />Proqram ALL Function ALL Activity ALL <br />=xxava-cev=vcs-aas::�sseeo=asmv�aasce=-eas--s:e'c <br />eav�e�-cve3�ax=--zszxzs�eeeeus <br />CM WORK ORDER ID: 7101196649342 (continued) <br />N/A <br />PIPE36060747 <br />SADD44017047 <br />SETT36033547 <br />V�hiales: <br />ID <br />V2042 <br />V2112 <br />V2132 <br />V2146 <br />V2150 <br />V2225 <br />V2226 <br />V3505 <br />V6401 <br />VJ0017 <br />CONCRETE <br />PIPE 1" POLY I <br />SERVICE SADDLE <br />SETTER COP 1" <br />(ASSOC) <br />P.S. <br />6" W/1" CCT <br />(H15") <br />Aescription <br />------------------------------ <br />88 GMC 5-15 <br />91 CHEV 1 TON <br />81 GMC SERVICE TRUCK <br />87 CHEV 1 TON W/HYD. UNIT <br />87 FORD 2 TON W/CRANE <br />88 FORD 8YD <br />88 FnRD DUMP 5 YARD <br />82 CASE BACKHOE <br />BO CASE FLATBED TRAILER <br />'96 FORD 5 YARD <br />06/20 1997 1 28.02 <br />1997 64 • <br />06/11/1997 1 11.70 <br />06/11/1997 1 ____ 92 49 <br />Total Material Cost: <br />Hours_ <br />2.00 <br />1.00 <br />2.00 <br />2.00 <br />8.00 <br />1.00 <br />10.00 <br />8.00 <br />1.00 <br />1.00 <br />Total VehicLe Cost: <br />Work Description: <br />--------------------------------------- <br />METER #47382141 <br />14' LEF'P OF LEFT AND 17� OUT <br />___Cost___ <br />10.00 <br />5.31 <br />8.88 <br />9.60 <br />47.20 <br />15.36 <br />104.00 <br />129.60 <br />0.00 <br />14.75 <br />344.70 <br />40F.86 <br />� t 17•6� <br />g8.3J <br />Total cost for work order 7101196F49342: <br />1555 27 <br />