Laserfiche WebLink
Bob Sor en <br />From: Roy Harris <br />Sent: Wednesday, December 18, 2013 SA2 AM <br />To: Bob Sorgen <br />Subject: FW: Port Gardner Neighborhocd Side�valk Improvements <br />From: Narci Ricafrentc <br />Sent: �Vednesday, August 28, 2013 8:56 Ah1 <br />To: Ross Jol�nson <br />Ce: Tom Hood; Roy Harris; Tom Fuchs; Corey Hert; ian D1eston; iom Gallagher <br />S�bjeet: Port Gardner Neighborhood Sidewalk Improvements <br />Good Moming Ross, <br />Per field work with Roy Harris last Friday, [his project will he reduced to 33`d St only. On 33" and Lombard, I e�i�l be <br />adding another Wheel Chair Ramp in the South East comer. Speed Feedback sign wiil also be added in the project. <br />Location of the Speed Feedback Sign on 37'", do�vnhill to Broadway Avenue, will 6e decided by Corey H. fvly estima[e for <br />this project is $45,000.00 it will be done by small roaster project, where project changes �s zllowed but not Force <br />Account. <br />The remainder of the.fund, vdill be transferred to Roy Harris to be used in connruding 34'"'street; betweer; Wetmore t <br />and Rockefeiler Avenue. Construction in 34`" will t�e aUout tl�e remo��al <,nd replacenient of existing "concrete side�valk <br />'anil wheel ihair ramp on the north side. And the consVuUion of new concrete sidewalk and wheel chair ramp on the <br />south side(From P,ackefeller Avenue and taper to thc cast side of the <br />�lsphalt Alley). <br />Thanks, <br />-� �QIL/ <br />Narci Ricafrente � <br />X7235 (��� <br />V <br />