Laserfiche WebLink
i�verett <br />� <br />II�tSPECTION REPORT <br />Addiess �i�G' � zL (..L� <br />Conlractor �c �r ,- � /7G'�u S <br />Owner <br />Date <br />S - GO <br />TYPE OF INSPECTION REQUESTED <br />�LDG: Pmt. No. ��� � C] MECH: Pmt. No. _ <br />i 1 ELEQ Pmt. No. <br />❑ PLBG: PmL No. <br />❑ Temp. EIecL �Framing ❑ Gas Pipinp <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Siruct. Slab <br />❑ Wood Stove ❑ Rough-In ❑ Final <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION �C�RRECTION REQUIRED <br />❑ Corrections listed below MUST B MADE before work can be approved. <br />❑ Please contact inspector and arrange for appoiniment. <br />❑ Was not able to periorm inspection. <br />ALL �59�BP 10 FOR REINSPECTION — 24 hour no�ice required. <br />A ER FICATE OF O:,CUPANCY SHALL BE ISSUED AND POSTED ON <br />ruG ooGn��crc oov�e rn nnn.�s.un.. <br />