Laserfiche WebLink
Date <br />Application nor <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Describe Proposed Work <br />Project Address (if known) <br />Public Works Permit a <br />Bldg. Dept. <br />Public Works Foe <br />Total Fee $ - <br />Less Appl. Fee Paid $ <br />Balance Due 5 <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Cente•line of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show Tny proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424.5555. <br />Approved for Construction <br />CL <br />'�" //f <br />Dale <br />FINAL INSPECTION Date <br />Approved as Constructed <br />i <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everele tt, WA 98201 <br />Phone: 259.8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />z <br />O <br />N <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm. <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. p <br />Signature of Applicant J e <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEnEAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />