Laserfiche WebLink
Page 3 of 3 <br />The various permits will begin at the rough -in phase. All r.wgh-in inspections <br />(plumbing, mechanical and electrical) must be signed off prior to requesting a framing <br />inspection. In order to conduct rough -in inspections, all ncnv gypsum wallboard or <br />existing gypsum wallboard that is installed over a wall or ceiling cavity containing un- <br />inspected work (framing, electrical and/or plumbing) must be removed for inspection. <br />Any new insulation must also be removed for the rough -in inspections. <br />Enclosed please find a permit application and plan submission checklist. If you have <br />questions regarding any item in this letter or with the permit process, 1 may be contacted <br />at (425) 257-8812. Thank you for your prompt attention in this matter. <br />Sincerely, <br />Toy Lc� <br />Permit Services Manager <br />CC: <br />Tamra Gregory, Code Compliance <br />5;\TLcc\wot&Slop wod:Klangcmus\inspcclion upon-3506 Rmkcfclla A vc <br />