Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect Ride sever per City Standard #601. <br />4 Connect side sewer per City Standard #'s 601, 602, 604. a NccJ 61'Pta. Sid <br />_FN,;� aL �VPCcX o -f11c. SeLi:cr �Rl1.I <br />0 Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />i 1 Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />J 1 Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />S. <br />excavated material from foundation, sidewalk and driveways shall be hauled to an <br />�` . approved, permitted site. No wasting of material is allowed on this building lot. <br />9 Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line our to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across; the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. 33 <br />/O. PG-ve Par,Errs Spnces bc/r �d ftie C1vPLex, inS/o lC a Ca <c�lias%h <br />Oar Cr%tTy Sf rigc%hn/1402 LUW fa F✓nP �4/I +e rn'fo M") S/;/CSeuieti". <br />mee4 W(! ftic ;7udGic worts ins�ce�or oh sloe %o cle/crN ne he5f <br />PWComments`OCa4;av, -,"or C4f <br />cti bairn n�cf ho�-h� tLc'car„Pl.yii P41/,•;5 <br />//. A)7t/ $7G¢kC`p4rroeeodnPiuhb2 DIR c��/roJfec <br />rnSjvuthr✓ <br />