Laserfiche WebLink
.i <br />CLOSED C?i WORK ORDER6 REPORT <br />Total Utility Maintenance Management System <br />___________________________________08/15/1995=====_________________=====Pag==1== <br />Date Range :O1/09/1989 - OS/10/i995 <br />CM Work Order Range :1001091070001 - UT260E- <br />Item Range :<Blank> - WWZZ020001 - Pattern :7101196750320 <br />Program ALL Function ALL 1'attern :* <br />_Activity ALL <br />CM WORK ORDER ID: 7101196750320 Title: REPAIR 3712 ROCKEFELLER /��'� <br />«DLTPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: __ <br />Location ID: __ <br />Program 710 Function 119 <br />Date Completed: 08/10/1995 Activity 675 <br />Overall Craft: <br />Iss>>ed: OS/10/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL SSJ <br />UL WM,7 <br />Materials: <br />ID <br />ADAP34000547 <br />BOX000056247 <br />COUP34004647 <br />COUP34135447 <br />ELL034101447 <br />ELL034104247 <br />METE36089447 <br />NIPP34131247 <br />PIPE34060647 <br />VALV34008348 <br />WIRE00119847 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned Hrs Actual Hrs <br />---------------- <br />--------- ----------- <br />SMITH, STEVE J. 0.00 <br />WRIGHT, MICHAEL J. 5.00 <br />0.00 5.00 <br />Description <br />------------------------------ <br />ADAPTER 3/4'� MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" ANG MET X FIP @ <br />COUPLING 3/4" MIP X 1/2"CTSPJ@ <br />ELL 3/4" 90 DEG BRASS ' <br />ELL 3/4" STREET BRASS ^ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />NIPPLE 3/4" CLOSE BRASS ' <br />PIPE 3/4'� POLY I.P.S. <br />VALVE METER 3/4" IACK WING IP@ <br />TRACING WIRE 10 GAUGE <br />Total Labor Cost: <br />Date <br />08/08/1995 <br />08/08/1995 <br />08/08/1995 <br />08/08/1995 <br />OS/08/1995 <br />OS/08/1995 <br />08/08/1995 <br />08/08/1995 <br />OS/08/1995 <br />08/08/1995 <br />OS/OS/1995 <br /># Used <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />60 <br />1 <br />64 <br />Total Material Cost: <br />Vehicles: <br />i� Description Hours <br />----________ Cost <br />------------------------------ <br />------ ---------- <br />V2117 91 CHEV 1-TON HYD UNIT 5.00 <br />28.00 <br />Total Vehicle Cost: 2g,00 <br />Work Description: <br />---------------------------------- <br />Cost <br />75.15 <br />75.15 <br />150.30 <br />Cost <br />15.60 <br />13.13 <br />4.66 <br />3.70 <br />1.31 <br />1.74 <br />30.98 <br />0.78 <br />15.60 <br />8.46 <br />6.40 <br />102,36 <br />-----------------------------•--------- <br />