Laserfiche WebLink
CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />09/14/1995 <br />Page 2 <br />Date Range :O1/09/1989 - 09/14/1995 <br />- Pattern :7101096750185 <br />CM Work Order Range :1001091070001 - UT2608- pattern :* <br />Item Range :<Blank> - WW22�20001 <br />n��nr�m nr,r. Function ALL Activity ALL __________________________ <br />CM WORK ORDER ID: 7101096750185 (continued) <br />Vehicles: <br />ID <br />V2111 <br />V2113 <br />V2152 <br />V2219 <br />V2663 <br />V3603 <br />V6807 <br />VJ0002 <br />Description <br />91 CHEV 1-TON <br />91 CHEV 1-TON <br />g� pODGE W/HOIST <br />S6 GMC 5YD <br />87 VACTOR <br />86 CASE BACKHOE 780 <br />89 COMPRESSOR IR <br />93 INTERNATIONAL 10 YD <br />Total Material Cost: z69 63 <br />Hours <br />4.00 <br />2.00 <br />25.00 <br />3.00 <br />2.00 <br />24.00 <br />22.00 <br />19.00 <br />Total Vehicle Cost: <br />Cost <br />-----22.40 <br />11.20 <br />127.50 <br />34.20 <br />92.60 <br />1017.60 <br />107.80 <br />_-__448_40 <br />1861.70 <br />Work Descrip�ion: --"'-'- <br />------------ <br />-------------------- <br />------- <br />----------------------- <br />REPLACED 12' OF 8" MAZN� 6X8 TEE ON MAIN AND SIDE SEW.`.'R TO P/L. � <br />12'D, SP 7'D <br />4615.67 <br />Total cost for work order 7101096750185: <br />