My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3716 ROCKEFELLER AVE 2016-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
3716
>
3716 ROCKEFELLER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 9:52:54 PM
Creation date
2/27/2017 2:20:10 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3716
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />R[PAIR SPECIfICATIONS AND LIST 6F llORt: TO QE DID <br />Page Z <br />Date: ,lune 5, 1978 <br />0�•mer(s): _Ouen 6aagett <br />Address: 3716 Rockefeller <br />P,hone: 258-169f1 <br />Rebuild front porch steps re-using existing tread and riser material, but re- <br />placing carriages with new 2x12 fir. Remove old'concrete bottoin step and repour <br />a �e�a step/carria9e support. Retain 12 inch tread depth and provide cons'.ant riser <br />height of approximately 7!i inches. <br />Install a ���elded, black-painted, t�rought-iron type, 1',' wide handrail to each <br />side of porch ,teps. Railing pickets to be 9 inches o.c. <br />Replace the 21 pieces of lx4 v.g. fir decking (approx. 75" with riser overhang) <br />bett�een steps and front door. <br />Provide support for the °spongy" flooring in the second floor hall adjacent to <br />the heat vent. <br />Rebuild the support structure for the south front porch roof support column and <br />raise the south east corner of the porch roof back t� its proper level. <br />R�place the missing lap sid�ng in various places on th� front porch. <br />2. Rem�ve the 48-inch wide concrete steps (9) leading from the sidewalk and repour <br />nev� steps, retaining the 12-inch ti-ead dept.h. [nstall a r�elded, h;acl:-painted <br />tar�ught-iron type handrail, simila�� to thosc on ihe fror,t porch steps, on the <br />south side of these 'grade' strps. <br />3. Remove furnace chimney (to below rafters). Remove oil furnace. <br />Reset loose brick and replace missing bric4; at fireplace chimney top. <br />Rebuild firebox, install a cast-iron damper. <br />4. Install ne�•i composition, 3-taL shingles, 15-year warranty, owner to choose <br />color. Install new rlashings, rakes, etc. <br />Install white, prepainted aluminum gutters (seamless) and 2"x3" downspouts. <br />Shim or otherwise raise barge boards to brinq sagyiny uverhan9 levcl. <br />- Install.ve�its to serve attic areas. <br />Install sheat:hinq over furnace chimney hole. <br />5. Scrape, ;and, and cau14: and putty (wir.dows) to prepare exterior of house for <br />painting. Prime paint b;n�e �;�ood. I3��ush paint one finish coat of top quality <br />Dutch [3oy or f:elley-Moore e;.lei-ior oil-bas��J p, int to all ��xterior surfaces. <br />Owner to choose colors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.