Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Address 3�LL �OL��eI'P��PV' <br />Contractor �cuN � r <br />Owner �� `� �\ �O � <br />Date Z— � —�� <br />TYPE OF INSPECTION REQUESTED <br />i?CE3LDG: Pmt. No. �q S�� ❑ MECH: PmL No. — <br />❑ ELEC: Pmt. No. <br />❑ Temp. Elect. <br />❑ Footing <br />❑ Foundalion <br />❑ Ductwork _ _ <br />❑ Wood Stove <br />a'Masonry <br />❑ PLBu: Pmt. No. _ <br />i7 Framing ❑ Gas Piping <br />❑ Drywal�, Nailing ❑ Consultation <br />❑ Shear Nailing ❑ Groundwork <br />❑ Grid ❑ Struct. Slab <br />�'i Rough-In �Final <br />❑�ar�ice ❑ <br />� APPROVAL qs »o'ie�1 , ❑ PARTIAL APPROVAL <br />� ❑ CORRECTION REQUIRED <br />❑ Corrections lisled below MUST DE MADE before work can be approved. <br />❑ Please contact inspeclor and arrange for appoinlmenl. <br />❑ Was not able lo perform inspection. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES P,EiIOR YO OCCUPANCY. ��, <br />—1��--�— � - � i� <br />Inspector __Gate � <br />