My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
401 ROCKEFELLER AVE 2016-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
401
>
401 ROCKEFELLER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 2:17:37 AM
Creation date
2/27/2017 2:23:07 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
401
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CI.OSBD Q[ WORR ORDffiLS RSPORT <br />Total Utility Maintenance Manaqement System <br />=_�^V_ - - _ 06/13/i996 Paqe 1 <br />Date Ran e•O1 09 r--` �- -- <br />B • / /1989 - 06/13/1996 <br />Cli Work Order Ranqe :1001091070001 - UT1002- - pattern :710109675U139 <br />Item Ranqe :<Blank> - WW2202oG01 Pattern :* <br />Pra4='am 1u.I. Function ALL Activity d.I.L <br />-�-- - <br />CM WORK ORpER ID: 7101096750139 Title: REP2,IR � <br />«DUPLICaTE PRINTING OF THIS WORK ORDER» <br />Item ID: SS0895V009 -- SEWER SERVICE <br />Location ID: __ <br />Proqram 710 Function 109 <br />Date Completed: 05/24/1996 <br />Overall Craft: <br />Issued� OS/20/1996 <br />out of Service? NO <br />Meter P,eading: <br />Downtime: 0 hours <br />Status: HL <br />Labor: <br />Craft ID Name <br />----- ------ ---- <br />iiEO ?�►I, <br />SUP1 AGA <br />UL CJE <br />UL GCR <br />HEO I,Fi� <br />HEO MCC <br />(TI. Mii?� <br />HEO OHJ <br />HEO SDD <br />Ui WTE <br />Materials: <br />ID <br />CEME00061438 <br />CEME00061438 <br />COUP42300247 <br />COUP44300147 <br />ELL042303247 <br />ELL044303347 <br />ELL044303547 <br />ELL044303647 <br />ELL044303647 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />401 ROCKEFELLER AVEN[JE <br />Activity 675 <br />Issued by: HDA Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />ARNOLD, .�,RTHUR L <br />]hiiI.ES, GREGORY .�,. <br />C�,.SE, JAMES E. <br />GRENZNER, CHRIS R. <br />LIBHING, M.�[JRICE !,. <br />M�GEE, CARL C. <br />NAROON, HERBERT ARTH[JR <br />O�LEARY, BRI?,N J. <br />STECHER, DalfIEL D. <br />WESTVANG, TERRY E. <br />Description <br />CEMENT 20 MIN. SET 50 LB. Bl,G <br />CEMENT 20 MIN. SET 50 LB. BAG <br />COUPLING 4" CONC X 4° Cl/PL <br />COUPLING 6" CONC X 6° Cl/PL <br />ELL 4" 22 1/2 DEG SP X GASKET <br />ELL 6" 45 DEG l.LL GASKETED <br />ELL 6" 22 1/2 DEG ALL G�SKETED <br />ELL 6^ 22 1/2 DEG SP X G�,SKET <br />ELL 6" 22 1/2 DEG SP X GASKET <br />RING/COVER (SATHER) <br />C. D. F. (11SSOC ) <br />C.D.F. (ASSOC) <br />CSTC (WILDER) <br />ASPHALT (ASSOC) <br />ASPHALT (ASSOC) <br />Planned Hrs Actual Hrs Cost <br />----------- ---------- ---------- <br />0.00 8.00 151.84 <br />0.00 14.00 Z9g,�� <br />0.00 8.00 117.08 <br />0.00 7.00 98.14 <br />0.00 8.00 125.20 <br />0.00 2.00 38.82 <br />0.00 40.00 509.20 <br />0.00 38.00 587.10 <br />0.00 30.00 578.10 <br />0.00 24.00 357.84 <br />Total Labor Cost: 2862.68 <br />Date / Used Cost <br />-------- -------- ---------- <br />05/21/1996 1 11.31 <br />05/22/1996 1 11.31 <br />05/21/1996 1 3.09 <br />05/22/1996 1 6.67 <br />05/21/1996 1 2.35 <br />OS/21/1996 1 q,g� <br />05/22/1996 1 5.02 <br />05/21/1996 Z g,gg <br />05/22/1996 1 4.44 <br />05/21/1996 209. <br />05/28/1996 1 539.50 <br />05/29/1996 1 269.76 <br />05/30/1996 1 339.70 <br />05/31/1996 1 63.66 <br />05/31/1996 1 130.83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.