Laserfiche WebLink
. <br />{ <br />PUBLIC WORKS PERMIT COMMENTS <br />4• As per Public Works approved plan dated <br />Connect side sewer per City Standard #601. <br />side sewer per City Standard #'s 601, 602, 604. <br />all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharyed to a roof downspout infiltration system per City oT Everett <br />Storm Manual 34.6.2. Width _, Depth _, Length _, <br />10. ?he centractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />�`11,1 Install eresion control measures as determined by the Pubiic Works inspector, such ar, silt <br />fence, straw bales, s�vales, or erosion blankets. <br />12. Install erosion control rcee;ur�s per City of Everett Standards for small parcels <br />� <br />�13. Remove erosion control mear =s ��pon completion of the project prior to final eoproval of the <br />� permit. <br />'%14�i411 excavated material from fcundation, sidewalk and driveways shall be hauled to an <br />�� approved, permitted aite. No v�asting of material is allowed on this building lot. <br />15. Remove and replace curb, gu;.� - and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this propesal's fronta�e as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett St�ndard #307. <br />17. a��e driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catc`� basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />PWComments � / � <br />�} �i � C� � �-��' !� i' Llz <br />