Laserfiche WebLink
iF BUILDING 1S NOT PpSIT10NHU <br />INDICATED ON qppROVHD SITL I'L <br />A NEW SITE PLAN SHALL OC SUIi� <br />TED. NO FURTHER INSPECTIONS 1V <br />➢E MADE ON THIS PROJECT UNT1L" <br />AEV1StU SITE PLAN HAS UEEN APPN <br />DLPTS. THG DUILDING�PU[iLIC WOIi <br />Roof trusses to 6e deslgned <br />end drawing prepared by <br />a State Iicensed structuml <br />engineer. <br />� O(.�C.t k.' ��i'_(L <br />42'�4 <br />EX 1 ST I NG '�- <br />fkx•�t �� <br />1 �, <br />� <br />a <br />< <br />i �p. `, <br />� <br />i <br />n� <br />i� <br />�Ij <br />�� <br />� <br />' PRO <br />� GA <br />� <br />i <br />/���r7�J <br />5 •ntN z�,re• ze •4- <br />60' <br />4 <br />GRADING AND DRAIN4GE <br />1. Provisions shill bz made for ihe contro and drainage of suAac <br />water around buildings by: gutl�rs, drai.i lines, inlets and catch <br />basins or ollier neceseary drainage stru:tures and slwll be instt <br />where storm watar disposal cannot G� obtained without lheir u� <br />where eresion cannct b: prevent_d by finish �rading and plant <br />Dry w;lls shall not be inslallad in areas where lhe soil is not w <br />drained andJor porous. _ <br />Gnding sh�Il b= provided lo insure: <br />(a) Dive�sion af watcr o�vay (rom buildi:ies. <br />(b) Prevention of standing water and soil satu�ation detrimental <br />to shuci��rs and lol usc. <br />(c) Tlut naWral drainage clwnnels or bastns are not DlockeA or <br />filled. <br />(d) Provisions for the disposai ot water trom a foE.� <br />fej Protection of adjoining property, <br />It Is owners responsibiliry to eslalilish ard slake all <br />prope�ry linos. <br />Appmved as lo compi�ancr. wdh <br />zoninp. SEPA ond cfucrehon,�ry po�mit <br />roquiremen�s. <br />�Y/y'%� ��i Q�� D;Uc '-�lG� <br />�Iunnir�Jaut <br />•, <br />� <br />