My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5616 ROCKEFELLER AVE 2016-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
5616
>
5616 ROCKEFELLER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 12:47:22 PM
Creation date
2/27/2017 2:30:46 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
5616
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br />� Verni� Holasn <br />90/26171 <br />Pags tvo of Cwo <br />� <br />� <br />✓9. At lea�t ona raceptacl� outlet, in addition to any providad for laundry <br />equipsant, shall ba inotalled in aach ba�a�snt and ahall hav� <br />ground-fault circuit-interrupter protection for par�onnel and it ohall <br />ba so Ldsntifi�d. <br />f10. Provida footing for entire length of bearing vall along aide of ataira <br />at basauant. <br />�11. Svoke detector requirad on each story and 1n ths baseoent. Requlrad <br />•soke datactor� shall recaive their prisary power frou tha building <br />wirina. Detectors shall sound an alars audible in all sleeping areae <br />of tha dwelling unit. <br />�12. Prwide ■afety alazing in hazerdous locations as defined in Section <br />5406(d) U6C. <br />�13. All receptacle outlets in kitchens shall be gound-fault <br />circuit-interruptar protected. <br />�14. Provlde landing at exterior entrance■ and/or eaits. Landinga ahall be <br />not nore then 7" below interior finished floor. <br />✓15 Double 2 x 8 header at bedroona 1 and 2 overatraesed in horizontal <br />ahear. <br />✓16. Deaign loads indicated under "etructural notee" on ahaet 1 shov roof <br />liva load at 25 PSF and dead load at 10 PSF, but ths typical wall <br />eection on aheat 3 ahova the roofing naterial to be concrete tiles. <br />Check loading o£ roof ineubers <br />In order for the proceseing of your application to continue, it will be <br />necessary to provide tha Building Department vith tvo couplete new sets of <br />drawinga reflacting the correctiona requeated. <br />Upon reaubuittal of the drawings, your application will be given priority and <br />plan reviav will racoumence. <br />All of the above infoznation ahall be of auEficlent detail and contain <br />sufficient information to ensure that the pruposed structure Will be <br />constructed in compliance with the City Building Code, <br />Sectiona ehall ba applicable to plan subnitted. <br />Sincerely, <br />�7�� � • <br />Jeff Heilman <br />Engineering Technician <br />JH:gab/11-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.