Laserfiche WebLink
City of Everett <br />Building Division <br />Area and Fee Calculations <br />For Structures Les.% Than 2500 S.F. <br />GLC-I--� <br />Plan Check No. C�02-0I - G D 9 <br />AREA <br />Main Floor I G1 SQ. FT. @ $55.30 / S.F. = $ � <br />Upper Floor "7 c`D SQ. FT. @ $55.30 / S.F. = $43 Is + <br />Lower Floor 4:;)._SQ. FT. @ $55.30 / S.F. _ : <br />Garage T SQ. FT. @ $19.90 / S.F. = <br />Deck SQ. FT. @ $15.00 / S.F. = $ <br />Other I OJ SQ. FT. @ S LtLo / S.F. = $ <br />TOTAL $ / 0 z 4j Z S <br />Total conditioned Space I G 9 9 — <br />Glazing <br />Main Floor 13ro 5 SQ.FT. <br />Upper Floor 7 5 SQ.FT. <br />Lower Floor SQ.FT. <br />Total ?,61 5 SQ.FT. / 5. 3 % <br />