My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
303 ROSE WAY 2018-01-02 MF Import
>
Address Records
>
ROSE WAY
>
303
>
303 ROSE WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 2:38:48 PM
Creation date
2/27/2017 2:38:06 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSE WAY
Street Number
303
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />nnect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />Connec. -ooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length <br />10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. nstall a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the _ . Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the req;jirements of NFDA <br />Standards 13D. <br />:A v t:, _rc r( PcT�E / 3 E H +I v L <br />A)o .u.ls—��.✓CJ OF/ f%1L <br />PWcormmns IL <br />
The URL can be used to link to this page
Your browser does not support the video tag.