Laserfiche WebLink
CLOSED CM WORR ORDERO REPORT <br />Total Utility Maintenance Management System <br />07/15/1997 Page 1 <br />-------------------------------------- <br />Date Range :12/03/1900 - 07/O1/1y97 <br />CM Work Order Range :1001091070001 - PW2548-19- Pattern :7101196751109 <br />Ttem Range :<Blank> - WVL3694L05 Pattern :* <br />Program AIL Function ALL Activity ALL <br />-------------------------------------------------------------- <br />CM WORK ORDER ID: 71011967511b9 Title: CONVERT 407 ROSE WAY <br />«DUPLICATE PRINTING OF THIS WORK OR�ER» <br />7t?m ID: W50685N024 -- WATER SERVICE <br />Location TD: -- <br />Program 710 Function I19 Activity 675 <br />Date Completed: 06/13/1997 <br />overall Cra£t: <br />Issued: 06/il/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST TDE1 <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />BOXOU0065547 <br />COUP34142747 <br />COUP36143547 <br />ELL034101447 <br />ELL034104247 <br />METE36089447 <br />PIPE34060647 <br />SETT34149747 <br />Issued by: WMW • Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />---------------------- <br />CAVANAH, SHANE G. <br />THOMPSON, DWAYNE E. <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />BOX METER CONC W/STEEL LID <br />COUPLING 3/4" CTS COMP X MIPT@ <br />COUPLING 1" CTN X 3/4" MIP @ <br />ELL 3/4" 90 DEG BRASS - <br />ELL 3/4" 90 DEG STREET BRASS " <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4" (H7") <br />vehicles: <br />ID Description <br />------------ ------------------- <br />V2146 87 CHEV 1 TON W/HYD <br />Work Description: <br />--------------------------------- <br />HOME BUSINESS <br />Planned Hrs Actual Hrs <br />----------- --------- <br />0.00 4.00 <br />0.00 4.00 <br />Total Labor Cost: <br />Date <br />06/13/1997 <br />06/13/1997 <br />06/].3/1997 <br />06/13/1997 <br />06/13/1997 <br />06/13/1997 <br />06/13/1997 <br />06/13/1997 <br />06/13/1997 <br />06/13/1997 <br /># Used <br />4 <br />2 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />4 <br />1 <br />Total Material Cost: <br />Hours <br />--------- ------ <br />UNIT 4.00 <br />Total Vehicle Cost <br />------------------- <br />Cost <br />19.20 <br />-----15.20 <br />Cost <br />53.92 <br />76.60 <br />130.52 <br />Cost <br />33.52 <br />15.08 <br />52.32 <br />4.08 <br />4.82 <br />1.36 <br />3.02 <br />30.67 <br />0.84 <br />3£1.60 <br />164 31 <br />------------------------- <br />