Laserfiche WebLink
CLOS€D CM F►pgR pgDgRS RSPORT <br />Total Utility Maintenance Management System <br />02/27/1996 <br />________________________________________________________________________P=g==1== <br />Date Range :O1/09/1989 - 02/14/1996 <br />CM Work Order Range :1001091070001 - UT1002- - Pattern :710123',730086 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Functioa ALL Activity ALL <br />________________________________________________________________________________ <br />CM WORK OkDER ID: 7101236730086 Title: INSTALL 415 - ROSE WAY <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: __ <br />Location ID: __ <br />Program 710 Function 123 Activity 673 <br />Date Completed: 02/12/1996 <br />Overa7.1 Craft: <br />Issued: O1/09/199G Issue3 by: HDA Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: �IL <br />Labor: <br />Craft ID____ Name Planned Hrs <br />----- ------------------------------ --- <br />HEO AAI, <br />SUP 2 BBR <br />UL GCR <br />UL HLF <br />DL HRR <br />UL <br />EO <br />EO <br />UL <br />EO <br />iTI, <br />HEO <br />KNL <br />MJL <br />MJL2 <br />NCR <br />�DK <br />. 3R <br />WRD2 <br />Materials: <br />ID <br />CEME00061438 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />FIPE44304247 <br />ARNOLD, ARTHUR L <br />BAILEY, BILL R. <br />GRENZNER, CHRIS R. <br />HUSBY, LAItRY FRANK <br />HAINES, RYAN R. <br />KEEFE, NEIL L. <br />MARKER, JAMES L. <br />MITCHELL, JEFFREY L. <br />NIETHAMER, CHARLES R. <br />STUART, DARRELL K. <br />THOMSEN, GENE R. <br />WINSTEAD, RICHARD D. <br />Description <br />CEMENT 20 MIN. <br />CB 15/BASE <br />TOP COARSE <br />CB 15/RISER <br />C.D.F. <br />C.D.F. <br />ASPHALT <br />CB FRAME/GRATE <br />SET 50 LB, BAG <br />(ASSOC) <br />(ASSOC) <br />(ASSOC) <br />(ASSOC) <br />(ASSOC) <br />(ASSOC) <br />(SATHER) <br />PIPE 6" PVC SEWER <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />O.QO <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />24.00 <br />2.00 <br />4.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />24.00 <br />28.00 <br />2.00 <br />2.00 <br />2.00 <br />Total Labor Cost: <br />Date <br />O1/12/1996 <br />O1/11/1995 <br />O1/16/1996 <br />O1/16/1996 <br />O1/16/1996 <br />O1/17/1996 <br />O1/18/1996 <br />O1/25/1996 <br />O1/12/1996 <br /># Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />162 <br />Total Material Cost: <br />Cost <br />455.52 <br />48.92 <br />56.08 <br />24.24 <br />16.00 <br />29.82 <br />37.34 <br />441.12 <br />392.56 <br />34.48 <br />29.82 <br />39.10 <br />1605 CO <br />Cost <br />44.52 <br />226.5 <br />108.15 <br />31.56 <br />177.48 <br />136.78 <br />225.33 <br />��- <br />243.00 <br />1371.16 <br />-IC4- .�� <br />1 C ^�' <br />��� <br />�` <br />