Laserfiche WebLink
w <br />. � ( <br />PUBLIC WORKS PERMIT COMMENTS <br />d. As per Public Works approved plan da.dd <br />5. Connect side sewer psr City Standard #601. <br />�Connect side sewer per City Standard #'s 60� , 602, 604. <br />7. ConnecS ail rooftop downspouts to the side sewer. <br />� Connect rooftop downspauts to the drainage system p4ovided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11. Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />i3 Install erosion control measures per City of Everett Standards for small parcels <br />13. Remove erosion control measures upon comp'etion of the project prior to final approval of the <br />permit. <br />14 All excavated material irom foundation, sidewalk and driveways shall be hauled te an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City o` Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Pubiic Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Stsndard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21 A sprinkler system <br />Standards 13D. <br />is required for this building in compliance with the requirements of NFDA <br />PWCommems r � e I� <br />� v l � ��S�W� <br />