My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10418 ROSEWOOD AVE 2018-01-02 MF Import
>
Address Records
>
ROSEWOOD AVE
>
10418
>
10418 ROSEWOOD AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 3:12:40 PM
Creation date
2/27/2017 2:45:58 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10418
Notes
SINGLE FAMILY DETACHED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: 10/14/2010 <br />Public Works Permit #: PW1010-010 <br />Buildinq Permit #; C1010-010 <br />Planninq Reference #: <br />Public Works Fee $: $ 25.00 <br />Other $: <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />FAR EAST ENTERPRISE LLC <br />522 ALDER ST #202 <br />EDMONDS WA 98020 <br />PHONE: 2064996292 <br />PHONE: <br />TAX PARCEL ID # <br />SITE ADDRESS: 10418 ROSEWOOD AVE LOT 4 <br />DESCRIPTION OF PROPOSED WORK: <br />NEW HOUSE (BASIC 404-B) <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Connect side sewer per City Standard #'s 601, 602, 604. <br />5. Connect rooftop downspouts to the drainage system provided for this lot. <br />6. Install erosion control measures per City of Everett Standards for small parcels <br />7. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitt4qd:;site �; ~ <br />No wasting of material is allowed on this building lot. <br />8. No dirt, mud, rocks or debris to be tracked onto roadway. <br />9. Adjust water meter box 1" above sidewalk grade. <br />10. Maintain Tof clearance around fire hydrant. :X ' ►"� <br />11. All weather fire lane access to be maintained throughout construction. Z <br />12. The contractor must meet with the Public Works Inspector to discuss previously unresolved site corrections. <br />Refer to attached letter dated 10/25/10 with a copy of the punch list and CALL CLIFF LINDMAN at 425-339.7404. <br />?'I n ��.! ���� ~7 i-r7 'Y• ..._ice <br />On <br />C.- <br />L <br />Approved for Construction Date <br />IRAL INSPECTION Date <br />Approved as Constructed z ._� Z <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />5 <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.