Laserfiche WebLink
JUN-04-02 13=40 FROM=EVERETT PLANNING DEPT ID=4252_78742 PAGE 4/E <br />Jun 03 02 10: 184 WEELBORG ENG I h1ZEwRI MG 4253 175000 p • '� <br />HYDRAULIC PROJECT APPROVAL s�k.fw„i <br />RCW 77.55.100 T apptal pursuant to Chapter 34.05 RCW tkprrtwe i of Fish and Wildlift <br />Reg.es 4 anke <br />MAW 'iWIS Mill CreckRaWrvor4 <br />#MM Milt Greek. Wexbisctcn 42012 <br />DATE Q6 i LU_EA MM124, 20Q2 1,9G l+!l11LAI1� . 00-Fta3"2 <br />be p4mcd at a maximun+ interval of three feet (on ccnlcr) and maintained as raw 5 +s : 01 three years to ensure 30 <br />percent survival. <br />24, Approach matcrifll ,5hail be structurally stable and be composed of mattcrial that, if eroded into the stream, shall not <br />be dwitnental to fish life. <br />25. Equipment used for thi> prqject may operate: below the ordinary high water litre, provided the: drive mechanisms <br />(wheels, tracks, tires. etc.) shad not enter oroperim below the ordinary high water line. <br />26. Equipment used for this project shall be free ofextcrnal petroleum -based pmducts While working .around the Stream, <br />Accumulation of soils or debris shall be removed from the drive mechanisms (whccis, tares, tracks_ etc.) and <br />undcresrriage. of equipment prior to its working, below ►he ordinary high water li�lf'. Equipntttit shall be checked <br />daily for leaks and any necessary kapsirs shall be cnrnpleted prior to commcrcros Lx ::• c avitivitics along the stream. <br />27- Equipment crossings of the stream are not authorized by this HPA. <br />28- Erosion control methods shall be used to prevent silt -laden water from catering the: stream. These may include, but <br />arc not limited 10. Straw bales. filter fabric, temporary xediment ponds, cheese dauss of pea gavel -filled burlap bad <br />or other material, and/or immcdiatr; mulching of exposed areas. <br />29. W astewatt:r from project activities and water removed from within the wort: aerca shall be routed to an arcs landwafd <br />of the ordinary high Water line to allow rrmoval of fine stdiment and other contam.i=nts prior to being discharged <br />to the stream. - <br />30• All wait mutcriat such as consv=rion debris, silt, excess dirt or overburden resu€zing *rom this project shall be <br />deposited above the list its of flood water in an approved: upland disposal site. <br />31. If high flow conditions that may cause siltation are encounictcd during this proj=rfi wook shall stop until the flow <br />subsides. <br />32. it .lone care Shall be taken to enure that no pctroloum products, hydraulic fluid, fresh cernMt, scdiments, <br />sediment -laden water, chemicals, or any other toxic or deleterious materials are Allewcd to enter or leach ipto the <br />stream- <br />SEPA; UNS by Snohomish Counry final on May 17, 2001 <br />nPPLICATIONACCEPTED; Scptember25,2001 EN>PORC£MlENTOl';:��.``���� �gf9tlxersO43 �PiJ <br />Eric D. Pcntico (425)379-2305� forDi,reettrr <br />Area Habitat Biologist WD1PW <br />r£NERA1,,PROVISIONS <br />Page 3 of 5 <br />