My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10430 ROSEWOOD AVE 2018-01-02 MF Import
>
Address Records
>
ROSEWOOD AVE
>
10430
>
10430 ROSEWOOD AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 3:26:12 PM
Creation date
2/27/2017 2:47:28 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10430
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC PROJECT APPROVAL State of Washington <br />RCW 77.55.100 -appeal pursuant to Chapter 34.05 RCW Department of Fish and Wildlife <br />lDparuMnie/ Region 4 Office <br />FISHaad 16018 Mill Creek Boulevard <br />WULUT Mill Creek, Washington 98012 <br />DATE OF ISSUE: Mav 24, 2002 LOG NUMBER: 00-F1439-02 <br />At the request of, James Weelborg, on May 13, 2002, this Hydraulic Project Approval (HPA), which now supersedes all previous <br />HPAs for this project, is a provision change and an HPA extension of the original HPA issued October 15, 2001. <br />PER HTTEE <br />Jack Kaleas <br />4951 1 84h St. <br />Seattle, WA 98155 <br />(206)545-6826 <br />(425) 742-9140 <br />PROJECT DESCRIPTION: <br />PROJECT LOCATION: <br /># WRIA WATER BODY <br />1 08.0059 Unnamed Tributary <br />AUTHORIZED AGENT OR CONTRACTOR <br />Weelborg Engineering Associates <br />ATTENTION: James Weelborg <br />PO Box 1867 <br />Snohomish, WA 98291 <br />(425)347-5000 <br />(425) 347-5000 <br />Install stormwater detention facilities and culvert <br />10430 Rosewood Ave.,Snohomish County. <br />TRIBUTARY TO 1/4 SEC. SEC. TOWNSHIP RANGE COUNTY <br />Swamp Creek NW 23 28 North 04 East Snohomish <br />PROVISIONS <br />. TIMING LIMITATIONS: The project may begin immediately and shall be completed by December 31, 2003. <br />a. Work below the ordinary high waterline shall only occur between June 15`h and October 15`h of either year. <br />2. Work shall be accomplished per plans and specifications entitled, Rosewood Park, Rezone & Site Development Plan <br />dated April 16, 2002 and plans entitled Drainage Report for Rosewood Park, dated November 30 2001 and revised <br />February 20, 2002, and submitted to the Washington Department of Fish and Wildlife, except as modified by this <br />Hydraulic Project Approval. These plans reflect design criteria per Chapter 220-110 WAC. These plans reflect <br />mitigation procedures to significantly reduce or eliminate impacts to fish resources. A copy of these plans shall be <br />available on site during construction. <br />Stormwater Facilities <br />There shall be no alterations to streambeds, streambanks, or wetlands, except for the permitted alterations to <br />stormwater runoff. <br />4. Retention/Detention (R/D) and water treatment facilities for stormwater runoff shall have been designed, and shall <br />be constructed and maintained to cause this development project to achieve stormwater runoff at rates no greater <br />than undisturbed forest. <br />Wastewater from activities and water removed from within the work area shall be contained to prevent any silt, silt - <br />laden water, or other contaminants from entering the stream or adjacent wetlands. <br />Erosion control methods shall be used to prevent silt -laden water from entering the stream or adjacent wetlands. <br />These may include, but are not limited to, straw bales, filter fabric, temporary sediment ponds, check dams of pea - <br />gravel filled burlap bags or other material, and, or imineiiate anulci:ing of exposed areas. <br />Page 1 of 1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.