Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />12/28/1994 Page 1 <br />Date Range :01/09/1989 - 12/23/1994 <br />CM Work Order Range :0810800810001 - 8405421080001Pattern :7401196730096 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7401196730096 Title: REPAIR 1871 ROSS AVE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WML0995M0l -- WATER MAIN LINE <br />Location ID: -- <br />Program 740 Function 119 Activity 673 <br />Date Completed: 12/23/1994 <br />Overall Craft: <br />Issued: 12/22/1994 Issued by: JSM Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Planned Hrs Actual Hrs <br />Cost <br />Craft ID <br />Name <br />----------- •---------- -- <br />----- ------ <br />WST JSM <br />------------------------------ <br />JEX, STERLING M. JR. <br />0.00 3.00 <br />3.00 <br />59.61 <br />41.04 <br />UL LMA <br />LIBBING, MAURICE A. <br />0.00 <br />0.00 3.00 <br />59.19 <br />WST MKC <br />MOORE, KIM C. <br />0.00 3.00 <br />48.09 <br />UL NSO <br />NIELSEN, SCOTT 0. <br />0.00 3.00 <br />UL SRJ <br />STENSETH, ROBERT J. <br />- <br />----44_10 <br />Total Labor Cost: <br />252.03 <br />Materials: <br />Date # Used <br />Cost <br />ID <br />Description <br />---------------- <br />--- <br />_ _________ <br />CLAM42020647 <br />------------------------------ <br />CLAMP REPAIR 4" 4.45-4.85 <br />STLS 12/23,1994 1 <br />69.83 <br />----- <br />Total Material Cost: <br />69.83 <br />Vehiclez: <br />Description <br />Date Hours <br />Cos` <br />ID <br />-------- ------ <br />--- <br />------------ <br />V2117 <br />------- ------ ---- ----- -------- <br />91 CHEV 1-TON HYD UNIT <br />12/21/1994 3.00 <br />17.40 <br />15.30 <br />V2139 <br />86 CHEV 1-TON W/HYD. UNIT <br />12/21/1994 3.00 <br />12.90 <br />V2328 <br />86 DODGE VAN <br />12/21/1994 3.00 <br />12/21/1994 3.00 <br />VH0003 <br />94 CAT BACKHOE <br />-----82_80 <br />Total Vehicle Cost: <br />128.40 <br />Work Description: <br />------------------ <br />4" PVC WATER MAIN BOWED AND LEAK WHEN <br />POTELCO CONSTRUCTION. <br />BILL: POTELCO CONSTRUCTION <br />------------------------- <br />TRENCH BOX WAS BEING REMOVED BY <br />