My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1871 ROSS AVE 2018-01-02 MF Import
>
Address Records
>
ROSS AVE
>
1871
>
1871 ROSS AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2025 3:51:03 PM
Creation date
2/27/2017 2:49:14 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
1871
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS' <br />1. Installation )f <br />with Snohomish <br />requirements. <br />District, must <br />ATTACHMENT °A" <br />SMA #12-90 <br />the sewage holding tank is subject to compliance <br />Health District and State Department of Health <br />Public Works, as well as Snohomish Health <br />approve the plans for the sawer holding tank. <br />2. Landscaping shall be provided <br />permits, landscaping plans must <br />Planning Department. <br />Prior to issuance of <br />any <br />the <br />be reviewed and approved <br />3. Signs must be brought into compliance <br />Shoreline Master Program. <br />as required by SMA #7-87 <br />and the <br />y. All activity shall comply with City and State noise regulations. <br />5. The proposal must also comply with all other Code and Ordinance <br />requirements not specifically set forth herein. <br />must be <br />6. The following information P submitted Planning <br />Public Works Permits for the <br />Department prior to obtaining <br />proposed fill: <br />1. Physical, chemical, and biological character of the <br />landfill material; <br />a. Source of landfill material; <br />al action; <br />b. Method of placement ancomp <br />C. Type of proposed surfacing; <br />e. Method of perimeter erosion control; <br />f. Proposed use of the fill area. <br />ro ress towards construction of a <br />project must be undertaken within two years after final approval <br />7. Construction or substantial P g ears. If the project <br />of the permit, and completed within five y <br />has not been completed in this time span the permit will be <br />reviewed by the Planning Department who will do one of the <br />following: for year, <br />or <br />- extend the permit for ony <br />- terminate the perrit <br />i icant '.oust <br />g. To improve public access to shoreline areas, the across the <br />. AEp <br />provide an 8, wide public easemeThispublic easement segmert <br />frontage of the subject property. is to contain a future bikeway connection to Langus Riverfront <br />Park. <br />attacha <br />
The URL can be used to link to this page
Your browser does not support the video tag.