Laserfiche WebLink
CITY OF EVEREIT <br />CONSTRUCTION PERMIT SUBMITTAL CHECKLIST <br />FOR: <br />NEW COMMERCIAL, INDUSTRIAL AND <br />MULTI -FAMILY (GREATER THAN 2 UNITS) PROJECTS <br />Complete checklist in ink. Fees: The plan check fee is due when permit <br />application is made; the permit fees are paid when the permit is issued. This <br />checklist must accomp: ny a completed permit application. <br />I. BUILDING DISCRIPTION <br />A. Use of Building (i.e. restaurant, office, etc.) <br />Marina Moorage Office <br />B. Construction materials within building (wood, steel, concrete, etc.) <br />Modular Office Structure as Manufactured by <br />Evergreen Mobile Company. Marysville <br />C. Building floor area (U.B.C. Section 407 "floor area"). If multiple floors <br />indicate floor area of each floor). <br />1st Floor 1152 sf Includes Existing Modular <br />Building and Addition <br />2nd Floor sf <br />3rd Floor <br />D. Indicate if the building will be equipped with an automatic fire <br />suppression system (fire sprinkler system). Please refer to City of Everett <br />ordinance no. 1759-90. <br />Yes _ <br />No X_ <br />Partial <br />E. Number of off-street parking spaces provided Twelve (12) <br />Describe below any other information which may assist the plans reviewer in <br />processing the permit application. <br />Shoreline Management Substantial Development Permit No. 12-90 <br />was issued 6-10-91. Additional information can be provided <br />by Evergreen Mobile Company if required. <br />(BLD23/Rcv. 7/92) <br />