My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2222 ROSS AVE BASE FILE 2018-01-01 MF Import
>
Address Records
>
ROSS AVE
>
2222
>
BASE FILE
>
2222 ROSS AVE BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 1:26:36 PM
Creation date
2/27/2017 2:54:45 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
2222
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUB�iC NURXS DEPAR7MEhT �,�y / � <br />Ul'ILITIES DIYISION ���" `v r� W'�^'' <br />3200 CEDAR STREET � <br />EVERE1T, MASHINGTON /. 0 � <br />�t.���.. <br />CO°T ESTIMATE SHEET <br />Requested by Gordon witcher Date of Request 5-7-86 <br />Charge Cost to (Name) <br />AddTe55 Smith Island Batch plant ZiF <br />Fund Utility ACC Program W.O. M Assigned <br />Installatian Location <br />Installation type/description/size/etc. One 6" hot tao. one 8" connection and one <br />4" connection. Kill old AC main in fill , <br />Total Estimated Cost 52135,00 <br />This estimate reflects the i�tilities Division having to <br />provide labor, equipment and materials to complete the <br />above mentioned installation including, but not liaited <br />to, the items identified to the right, Any labor and/or� <br />equipment provided by the contractor to facilitate the <br />xork by the City water department will be reflected in <br />a refund tu the person making the deposit. <br />Saw cut ............. <br />Shoring............. <br />Excavation .......... <br />Backfill ............ <br />Compaction .......... _ _ <br />Temporary Patch ..... _ <br />Permanent Patch .... <br />Furnish double check •ralve assembly for <br />temporary water supply .......... .... <br />Final hook-up after purity and <br />pressure testing ............ <br />(lYhenever the estimated cost is not sufficient to cover the total expense for labor, <br />material, equipment rental and administrative costs, the deficit shall be charged to <br />the property for which such installation was made and the owner thereof, and provided <br />further, that any excess payment shall be rcturned to the gerson applying for the <br />installation.) <br />Itemized Cost Estimate: <br />Labor � Overhead 1268.00 �. �G • C„ �� 259-8821 _ <br />Material 648.00 Estimate Prepared By Don wahl Phone N <br />Eau�ipment Rental 219.00 <br />Surface ResLoration <br />TOTAL ESTID'ATE 52135.00 <br />�,rr��od�� <br />�..t <br />�,9;�Y 0 7 1986 <br />_ <br />��ITY 0� EVERETi <br />��•�_':� �1�ark� ne..•. <br />cc: Larry Callahan <br />Don IYeitk.amp <br />Larry Crawford <br />Bob Chervenell <br />Clair Olivers <br />�, . �-�'. '� �,-''0� : �` <br />� cG� �' i 1 `f � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.