My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
615 ROSS AVE 2018-01-02 MF Import
>
Address Records
>
ROSS AVE
>
615
>
615 ROSS AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 10:28:11 AM
Creation date
2/27/2017 2:56:07 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
615
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A D OWL <br /> ENGINEERS <br /> A Division of DOWL, Incorporated <br /> April 4, 1991 <br /> W.O. #S11100-13 <br /> Mr. Gordon Witcher <br /> Department of Public Works <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Re: Dunlap Towing,Everett Woodchip Facility <br /> Dear Mr. Witcher: <br /> Attached are two copies of the plan set for the above referenced project. The City review <br /> comments of March, 1991 have been incorporated. Also attached is a shop drawing of the <br /> Fog Tite No. 1 Meter Box which has been called out to hold the backwater prevention <br /> valve assembly. <br /> The oil/water separator inlet control calculations are included herein. In sizing the <br /> oil/water separator inlet control the tailwater effect from the pond and vault were <br /> considered. The maximum flow rate will be achieved when the stormwater backs up in <br /> the inlet to the overflow spillway crest elevation. The 6-inch inflow pipe to the vault acts <br /> as an orifice with a design head. By design the vault maintains a permanent pool of <br /> water, so the_pipe_connecting the concrete inlet to the oil/water separator vault will have <br /> standing water. The hydraulic head discussed in the attached calculations is sufficient to <br /> provide proper flow capacity. <br /> The plan set containing the City's review comments is also attached. <br /> If you have any questions, please call me at 869-2670. <br /> Sincerely, <br /> DOWL Engineers, Inc. <br /> or <br /> Jeff Dendy, P.E. <br /> Project Engineer <br /> Attachments <br /> CC: Jay King, Dunlap Towing <br /> JD/iml <br /> 15263 NE 90TH STREET • REDMOND • WASHINGTON • 98052-3523 • 206 / 869-2670 <br />
The URL can be used to link to this page
Your browser does not support the video tag.