My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
615 ROSS AVE 2018-01-02 MF Import
>
Address Records
>
ROSS AVE
>
615
>
615 ROSS AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 10:28:11 AM
Creation date
2/27/2017 2:56:07 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
615
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br /> UTILITIES DIVISION <br /> COST ESTIMATE SHEET 2300 CEDAR STREET <br />• <br /> EVERETT, WASHINGTON 98201 <br /> (206) 259-8800 <br /> Receipt # Date Paid <br /> X Cost of Work Order $ 41,430 Work Order # <br /> Cost of Service Order $ Service Order # <br /> Contact Person: NJ/hik.it 00QLAP c ' (c). Telephone # z-/66 -3 Jut <br /> Requested By: Tom Thetford Date of Request <br /> Property Owner (name) City of Everett <br /> ng <br /> Charge Cost to (name if different than owner) I k` <br /> po iSox. 5=1 3 tAxedu, 144. 9 325 <br /> Address 3.l6a7Oeda'r SJ-.re f City Eue ett 1 Zip <br /> Installation Location Ross Ave west of Dagmars <br /> Installation type/description/size/etc. Excavate and install 650' of <br /> 8' DI pipe to replace 6" AC main and restore area. <br /> [ ] The following estimate is based upon the Utilities Division <br /> providing all labor, equipment, materials, restoration, and final <br /> hook-up. <br /> [ ] The following estimate is based upon the Street Division work group <br /> providing all labor, equipment, materials and restoration to <br /> • property. <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to <br /> the property for which such installation was made and the owner thereof, and provided <br /> further, that any excess payment shall be returned to the person applying for the <br /> installation. <br />' Itemized Cost Estimate: <br /> Labor & Overhead $2 4 ,4 8 0. 0 0 cc: Bldg. Permit Counter <br /> Clair Olivers <br /> Material 11, 010. 00 Tom Thetford <br /> Don Weitkamp <br /> Equipment Rental 5,940. 00 Kirk Brooks <br /> Gordon Witcher <br /> Surface Restoration 0. Don Wahl <br /> Dan Lowell <br /> Total $412.430.00 . Stan Mitchell <br /> Prepared by Oliver Wahl <br /> Accepted by Representing <br /> Rwis.d 08/16/91 <br /> 04718CST (8-22-91) 48:) <br />
The URL can be used to link to this page
Your browser does not support the video tag.