Laserfiche WebLink
PUBLIC WORKS DEPARTMENT <br /> UTILITIES DIVISION <br /> COST ESTIMATE SHEET 2300 CEDAR STREET <br /> EVERETT, WASHINGTON 98201 <br /> (206) 259-8800 <br /> Receipt # Date Paid <br /> X Cost of Work Order $18, 966.00 Work Order # <br /> Cost of Service Order $ Service Order # <br /> Contact Person: Telephone # <br /> Requested By: Tom Thetford Date of Request <br /> Property Owner (name) Dunlap Towing 466-3114 <br /> Charge Cost to (name if different than owner) P.O. Box 593 , <br /> Address City LaConner Zip 98257 <br /> Installation Location Ross Ave West of Dagmar Landing <br /> Installation type/description/size/etc. Replace 95' section of 6" AC <br /> main, replace 110' of 6" AC main with 8" DI pipe. <br /> [ ] The following estimate is based upon the Utilities Division <br /> providing all labor, equipment, materials, restoration, and final <br /> hook-up. <br /> [ ] The following estimate is based upon the Street Division work group <br /> providing all labor, equipment, materials and restoration to <br /> property. <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to <br /> the property for which such installation was made and the owner thereof, and provided <br /> further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> Itemized Cost Estimate: <br /> Labor & Overhead $13 , 056. 00 cc: Bldg. Permit Counter <br /> Clair Olivers <br /> Material 4, 110. 00 Tom Thetford <br /> Don Weitkamp <br /> Equipment Rental 1,800.00 Kirk Brooks <br /> Gordon Witcher <br /> Surface Restoration o. Don Wahl <br /> Dan Lowell <br /> Total $18,966.00 Stan Mitchell <br /> Prepared by Oliver Wahl <br /> Accepted by presenting <br /> Revised 08/16/91 <br /> OW717CST (8-22-91) (- —C) <br />