My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
615 ROSS AVE 2018-01-02 MF Import
>
Address Records
>
ROSS AVE
>
615
>
615 ROSS AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 10:28:11 AM
Creation date
2/27/2017 2:56:07 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
615
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br /> UTILITIES DIVISION <br /> COST ESTIMATE SHEET 2300 CEDAR STREET <br /> EVERETT, WASHINGTON 98201 <br /> (206) 259-8800 <br /> Receipt # Date Paid <br /> Cost of Work Order $ /I Z0 • Work Order # <br /> Cost of Service Order $ Service Order # <br /> Contact Person: "1"--0b Telephone # <br /> Requested By: ` %U " T tie T F v c( Date of Request ` Z o - 9/ <br /> Property Owner (name) <br /> Charge Cost to (name if different than owner) <br /> Address City Zip <br /> Installation Location d 5,5 4Uellu h .e �� A-7 A4 A S G ol,•tc <br /> Installation type/description/size/etc. /4.4e 1 S 21-4// //o� Asr <br /> . <br /> ((AA- s o D c 7"; /..e 70 70, ) A o oA''' 2(.42 .yh:6 2c " ..P <br /> favt d- r 2 5 1--We /-)Y' ,4 <br /> [AT The following estimate is based upon the Utilities Division <br /> providing all labor, equipment, materials, restoration, and final <br /> hook-up. <br /> [ ] The following estimate is based upon the Street Division work group <br /> providing all labor, equipment, materials and restoration to <br /> property. <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to <br />• the property for which such installation was made and the owner thereof, and provided <br /> further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> Itemized Cost Estimate: <br /> Labor & Overhead 1 3/" cc: Cheryl Fontaine <br />• U Clair Olivers <br /> Material y'IO o Tom Thetford <br /> Don Weitkamp <br /> Equipment Rental e Kirk Brooks <br /> Gordon Witcher <br /> Surface Restoration O. Don Wahl <br /> Dan Lowell <br /> Total / / Q Co Stan Mitchell <br /> Prepared by 69a <br /> Accepted by _ Representing <br /> 09013.E 11/29/90 <br /> Cost <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.