Laserfiche WebLink
BROCKWAY <br />ARCH:TECTURE R PLANNING <br />City of Everett Permit Services <br />% Jeff Heilman — Development Technician <br />3200 Cedar Street <br />Everett WA 98201 <br />P.O. Box 1065 Everetl WA 96206-7065 <br />2823 RockefeAer Avenue, Evcretl, WA 98201 <br />(425) 252�6848 Everett <br />Toli hee 1-686-377-{t14 <br />(�25) 259�742 FAX <br />EMAIL brocarch�pte.net <br />C c�3� O - ov5 <br />November 6,2003 <br />Re: Submittal of revised responses to the plan review letter addressed to Mr. <br />Chris Mobley of Premium Construction Group, and dated October 17,2003. <br />Dear Jeff <br />The following response letter is in a point by point format per your October <br />17,2003 letter. Be advised, per the owner that building will have gas fired space <br />heatirg nnd hot water heaters, and Mechanical and Electrical aspects of the <br />project will be by bidder oesign with appropriate permit submittal packages at <br />that time. Attached are two complete new sets of drawings with the corrections, <br />and addressing the other issues requested, incorporated per the following <br />commentary. <br />1. The Living Room has significant unobstructed light through the kitchen and <br />entry areas (66 sf with 50.5 sf unobstructed) in addition to the new 6 x 3(15.8 <br />sf glazing areal window shown. Nowever the area through the other spaces <br />is less than SG% of the area of that living room wall. The area of the living <br />room is 251 sf therefore the window are should be 25.1 sf. An 8 x 4 window <br />(29 sf glazing area) is now shown in place of the 6 x3 (15.8 s�. See sheets A- <br />4 and A-5 <br />2. Refer to the detail on Sheet 7/A-4. <br />3. Refer to detail 4/A-4. <br />4. Per Mechanical/HVAC bidder/subcontractor design.. Refer to Sheet A-5. <br />5. Per Electrical biddedsub-cc �tractor design, see Sheet A-5. <br />6. Per plumbing sub-contractor, see Sheet A-5, additional by differed submittal <br />If needed. <br />7. Per the above discussion, Sheet A-5, and HVAC sub-contractor submittal <br />If needed. <br />8. Refer to the sheet A-5 both <br />schedule for the lower unit. <br />9. Refer to detail 8/A-4. <br />10. Refer to detail 6/A-4. <br />11. See the note on sheet A-5, <br />upper and lower floor plans and the window <br />and detail 5/A-4. <br />