Laserfiche WebLink
placed in 55-gallon drums staged on Site pending waste characterization and subsequent off-Site <br /> disposal at a properly permitted facility. <br /> 4.6 Certification <br /> The scope of work described in this Work Plan will be performed under the supervision of a <br /> Washington State Licensed Geologist. <br /> 4.7 Reporting <br /> A report will be prepared within 60 days after completion of the excavation and waste disposal <br /> activities. The report will summarize all activities performed as part of this Work Plan and include <br /> analytical data and disposal documentation. <br /> A second report will be prepared upon completion of the four quarterly groundwater monitoring events <br /> and submitted to Ecology. The second report will summarize all excavation, disposal, and groundwater <br /> monitoring activities performed and include analytical data and recommendations to request a NFA <br /> determination or additional groundwater monitoring (if required). <br /> 017386-174(123) 10 THIS DOCUMENT IS PRINTED ON RECYCLED PAPER <br /> Encore Environmental Consortium,LLC <br />