Laserfiche WebLink
1137;41} <br /> INSIGHT ENGINEERING CO. <br /> STORMWATER SITE PLAN <br /> For <br /> EVERETT CHEVROLET <br /> Prepared for <br /> City of Everett <br /> 2930 Wetmore Ave <br /> Everett, WA-98201 <br /> 425.257.8700 <br /> Applicant/Owner: Contact: <br /> Harnish Auto Family Brian R. Kalab, P.E. <br /> 820 River Road P.O. Box- 1478 <br /> Puyallup, WA 98371 Everett, WA-98206 <br /> 253.682.9699 425.303.9363 <br /> Project Site Location: <br /> 7301 Evergreen Way <br /> Everett WA 98203 Ljo,L.f9/ ' <br /> IECO Project: 13-0610 <br /> Certified Erosion and Sedimentation Control Lead: <br /> To be appointed by contractor <br /> Stormwater Site Plan Prepared By: <br /> Jacob D. Mealey, E.I.T. <br /> R' <br /> Stormwater Site Plan Preparation Date: sy? \\A,s7;�{ <br /> Janurary 8, 2014 . � <br /> Date Revised: February 24,2015 <br /> Approximate Construction Date: <br /> May 1, 2015 l'i,:sAI. � `'�\ <br /> P.O Box 1478 • Everett, WA 98206 • P: 425.303.9363 <br /> F: 425.303.9362 • info@insightengineering.net <br />