Laserfiche WebLink
PUBLIC 'IRKS PERMIT 1J Date: 3/9/2016 <br /> Publit., orks Permit#: PW1603-020 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: B1603-004 <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 2,600.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT SCHOOL DIST 2 DYKEMAN ARCHITECTS <br /> 4730 COLBY AVE <br /> EVERETT WA 98203 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00605000500000 SITE ADDRESS: 3700 FEDERAL AVE P3 <br /> NEW PORTABLE CLASSROOM-JACKSON ELEMENTARY/TRAFFIC MITIGAT <br /> THIS PERMIT IS NOT FOR ANY CONSTRUCTION ON THIS SITE. <br /> THIS PERMIT COVERS TRAFFIC MITIGATION ONLY. <br /> VESTAL & WHITFIELD 1ST ADD BLK <br /> 005 D-00 -ALL OF BLK 5 TGW BLK 7 <br /> LOTS 11-20 INCL VAC <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> h•l <br /> TRAFFIC MITIGATION FOR ONE PORTABLE; <br /> $2600 <br /> 0 <br /> M": <br /> z <br /> • <br /> O <br /> O <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> �t 3- - /P causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> Ap roved for Construction Date remove same upon notic from the City and to replace public prop rty <br /> dama d thereby. —7 <br /> FINAL INSPECTION Date / �� r` <br /> Approved as Constructed Signature of Applicant Date' <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> ��LC <br />