Laserfiche WebLink
Time: s:os 4M contract stlmare.voucner <br /> Pio ecr:1 se For Work Order#3222 <br /> I Contractor: EPIC CONSTRUCTION,LLC <br /> Transmission Line#4 Joint Bonding Estimate#7 40 LAKE BELLEVUE#100 <br /> WO 3222 BID:$400,300.00 BELLEVUE WA 98005 a', <br /> TOTAL BID:$490,300.00 <br /> Total Amt Previous Amt Present Amt <br /> Contract Totals to Date $471,924.89 $453,808.17 $18,116.72 <br /> FINAL <br /> Retained Amounts $0.00 $0.00 $0.00 <br /> State Tax Amounts $40,113.62 $38,573 ko° ,y $1,539.92 <br /> `r�� <br /> Retainage not Withheld <br /> Amounts Paid $512,038.51 $492,381.8'7. <br /> per Retainage Bond <br /> Amount to be Paid This Estimate $19,656.64 <br /> # O -f <br /> r { <br /> Checked By f / Date 6/1,11 <br /> DE <br /> Recommended By ;l / Date 3.._/6---r6 <br /> Public Works Director „ f Date ^($ <br /> ,d <br /> Work Order Number: 3222 <br />