My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/09/06 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/09/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 8:47:30 AM
Creation date
3/1/2017 8:47:17 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/6/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 4 FINAL CONTRACT VOUCHER CERTIFICATION <br /> ONTRACTOR: Epic Construction, LLC ADDRESS: 40 Lake Bellevue,#100 <br /> ITY: Bellevue STATE: WA 98005 DATE: August 15, 2006 <br /> ROJECT TITLE: Transmission Line #4 Joint Bonding WORK ORDER NO. 3222 <br /> TATE WORK COMPLETE: August 1, 2006 , FINAL AMOUNT: $ 471,924.89 +wsst <br /> CONTRACTOR'S CERTIFICATION <br /> the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> id material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> ithorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> nployee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> onies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> lderstand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> hich I may have, arising out of the performance of said contract, which are not set forth in said estimate. <br /> -7- X MRvta3,1 <br /> ONTRACTO TITLE <br /> pic Construction <br /> ibscribed and sworn to before <br /> e this IT' day of Av-+st 7.atA9 <br /> i ' Notary Public <br /> and for the State of Washington, residing at C41"41.) <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> iertify the attached final APPROVED Date: £L 3-0( <br /> timate to be based upon actual <br /> easurements and to be true and correct. <br /> 271)��aC X -� <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> ie Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> ents and forwarded with the Final Contract Voucher Certification. <br /> )ntractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> ached. <br /> :vised 9/94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.