Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Professional Services Consent COUNCIL BILL # <br /> Agreement with URS \ Action Originating Department PW/Utilties f <br /> Corporation to Provide Pre- First Reading Contact Person Souheil Nasr <br /> design for the 36th Street Sewer Second Reading Phone Number 425-257-7210 <br /> Protection Project Third Reading FOR AGENDA OF Sep. 20, 2006 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> BNSF ROW, South of Budget Comm_ 9/13/06 Professional Services Legal <br /> 36th Street . • - Agreement <br /> Amount Budgeted 1,500,000 <br /> Expenditure Required 25,012 Account Number(s): UP 3283 <br /> Budget Remaining 1,474,988 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> The City's South End Interceptor is located on an easement within BNSF Right-of-Way_ BNSF will be <br /> constructing a new track that will cross over the 36" Sewer Line. This line needs protection to support the <br /> railroad loading. The protection of the 36" Sewer Line needs to be constructed by June 2007. <br /> This contract authorizes the consultant to prepare a pre-design study to determine the most appropriate <br /> way to protect the sewer line. After the completion of the pre-design study an amendment will be issued <br /> for the design phase. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign a Professional Services Agreement with URS Corporation in the amount of <br /> $25,012 for Pre-Design Services for the 36th Street Sewer Protection Project. <br /> 8 <br /> S\SNasr\36th St Sewer Protection'36th S Sewer Protection PSA Agenda.DOC <br />