My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/09/20 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/09/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 9:04:44 AM
Creation date
3/1/2017 9:04:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/20/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> REPORT OF BID OPENING Consent COUNCIL BILL# <br /> AND AWARD OF X Action Originating Department ENG/PS <br /> CONTRACT FOR THE 7TH First Reading Contact Person Ryan Sass . <br /> AVENUE S.E. SIDEWALK/ Second Reading Phone Number 257-8942 <br /> BICYCLE IMPROVEMENTS Third Reading FOR AGENDA OF Sept. 20, 2006 <br /> Public Hearing <br /> Initialed by: <br /> Department Head 1 <br /> CAA <br /> Council President 'T' <br /> Location Preceding Action Attachments Department(s) Approval <br /> 7th Avenue SE—93rd St. 7/12/06 Council Bid Summary Utilities, Streets <br /> SE to 100th St. SE authorized call for bids. <br /> Amount Budgeted $ 458,947.50 <br /> Expenditure Required $ 458,947.50 Account Number(s): PW3194 <br /> Budget Remaining - 0 - <br /> Additional Required - 0 - <br /> DETAILED SUMMARY STATEMENT: <br /> Bids were opened on August 8, 2006, for the 7th Avenue S.E. Sidewalk/Bicycle Improvements. Four bids <br /> were received , as shown on the attached summary, with the lowest bid submitted by Schwetz Construction, <br /> Inc., of Sedro Wooley, WA. The improvements will complete gaps in the existing sidewalk system on the <br /> east side of the street, remove existing obstructions, install drainage improvements, improve an existing <br /> traffic signal, and add a bicycle lane. <br /> The sources of funds for this project are: <br /> TIB Grant (State) $39,669.00 <br /> Fund 154—CIP III 45,000.00 <br /> Fund 157—Traffic Mitigation 162,958.00 <br /> Fund 301 —Arterial Streets 134,302.00 <br /> Fund 119— Street Improvements 77,018.50 <br /> Total $458,947.50 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize award of the construction contract for the 7th Avenue S.E. Sidewalk/Bicycle Improvements to <br /> Schwetz Construction, Inc., of Sedro Wooley, WA, in the amount of$458,947.50. <br /> W03194-Award.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.